1
|
- WestConnect Stakeholder Meeting
- June 22, 2005
- Tri-State G&T Offices
- Bob Easton - Western
|
|
2
|
- Result of the Colorado-Ute Bankruptcy and Subsequent Reorganization
between PSCo, Tri- State and PacifiCorp
- State of Colorado required an Electric Transmission Service Policy
Statement
|
|
3
|
- The Colorado Association of Municipal Utilities concerned about
Transmission Access
- Together Developed the Joint Transmission Access Principles dated
December 16, 1991 that guide CCPG activities
|
|
4
|
- Originally executed on 12/23/91 by:
- PSCO
- Tri-State
- CAMU
- PRPA
- ARPA
- CSU
|
|
5
|
- Others signing since:
- MEAN
- Western
- Aquila
- UAMPS
|
|
6
|
- Principles provide for:
- Coordinated Planning Process
- Procedures for Requesting Service
- Sharing Ownership in New facilities
- Rate Calculation Methodology
|
|
7
|
- Coordinated Planning Process
- Emphasis on Reliability Planning
- Efficient Use and Operation of Existing System
- Construction Enhancements to Accommodate Transmission Service Requests
- Information Exchange
- Share Study Costs
|
|
8
|
- Offer of Service – Pre-OATT
- Open requests
- Interconnections at 69-kV or higher
- Firm and Non-Firm
- First-Come-First-Served
|
|
9
|
- Additional Facility Requests/Ownership
- Made Available to Party Willing to Cost Share
- Adhere to Existing WECC/MAPP Procedures
- Open to All Parties – TPs, Merchants, IPPs
|
|
10
|
- Rate Calculation
- Embedded Cost
- Consistent with Sections 205 and 206 of FPA
- Billing Provision
|
|
11
|
- Dispute Resolution
- Rules of American Arbitration Association
- Parties can Select Non-Binding Arbitration
|
|
12
|
- Chair – John Collins - PRPA (until 12/31/05)
- Secretary – John Greenlaw – Western
- Two-year terms
|
|
13
|
- Use mostly to Conduct Regional Studies Required by NERC and WECC
Criteria and Guidelines
- Three Meetings/Year
- Joint Transmission/Generation Ideas
|
|
14
|
- Lamar DC Tie – 2005 – new E-W tie
- Tekla – Carr Draw – October 2005 – TOT4B
- Walsenburg – Gladstone – 2007 - Co-NM tie
- Nucla – Telluride – 2007 – TOT2A
- Miracle Mile – Ault – 2009 – TOT3
|
|
15
|
- Colorado Long-Range Transmission Planning Group
- Foothills Planning Group – PV/VQ Study
- Voltage Coordination Group
- Short-Circuit Database Group
- NERC/WECC Compliance Studies
- Real-Time Topology (TSM)
|